Massachusetts DG Collaborative: Reports to DTE

2006 Final Report

The 2006 Report will be posted on June 30, 2006 when it is filed with the Massachusetts DTE. When filed, this list of signatories will only include organizations which have affirmed by noon on June 28, by email to cummings@masstech.org, that they wish to be listed.

2005 Annual Report
This section provides the 2005 DG Collaborative Annual Report to the Massachusetts Department of Telecommunications and Energy and related documents. This report was submitted to the DTE on May 31, 2005. 

Complete 2005 Report (PDF)
This is the full annual report as filed with the DTE. Individual sections of the report are available below.

2005 Report Summary (30 pages)
Word | PDF

Annual Report and Summary Without Attachments (173 pages)
Word | PDF

Attachment A: Redlined Model Interconnection Tariff
Word | PDF

Attachment B: Model Interconnection Tariff
Word | PDF

Attachment C: Framework for Developing Win-Win Strategies for Distributed Energy Resources in Massachusetts
Word | PDF

Documents Referenced in 2005 Report

Generation Monitoring at the GSA Williams Building
Word | PDF

DG Interconnection Guide
Website

 
2003 Report

The DG Collaborative submitted proposed standards in its March 3, 2003 Report to the DTE (word), followed on May 15, 2003 by a Model Interconnection Tariff and contract (word).

 

View previous Drafts of 2005 Annual Report (superceded)