Post-Installation

Following approval of an interconnection, you will be required to sign an interconnection agreement with the utility. Your system must be installed within 12 months of this agreement's execution, and if it is installed after this period you will need to submit a new application.

The interconnection standards and agreement require a number of operational, insurance, and metering measures that should be considered before applying. The relevant sections of the standards are as follows:

Operations Requirements

Interconnection Standards Section 6.0

Insurance Requirements

Interconnection Standards Section 11.0

Metering, Monitoring, Communications, Confidentiality

Metering, monitoring, and communication requirements: Interconnection Standards Section 8.0

Confidentiality options: Interconnection Standards Section 10.0

Disconnection Process

Interconnection Standards Section 7.0